executed projects
Client: Federal Ministry of Transportation
Year: 2008
Kano-Katsina Road, Idoani-Idogu-Imeri, Road, Ipele-Isua Road, Ipele-Kabba Road, and Gbongan Kwara Road
- Site Survey and Road Assessment
- Traffic Condition
- Road Condition
- Road Mapping
Katsina State Bridge
Site survey of the Bridge at Ch. 39+500 along Katsina Jibia-Niger Republic Border Road in Katsina State
Ofiki River Bridge
- Site Survey and Assessment of Bridge
- Bridge Rehabilitation and Repair plan
- Repair Plan and Cost Estimating
- Road Mapping
Ogun River IV Bridge
- Site Survey and Assessment of Bridge
- Bridge Rehabilitation and Repair plan
- Repair Plan and Cost Estimating
- Road Mapping
Client: Louisiana Dept. of Transportation & Development
Year: 2007-2008
Baton Rouge Bypass Major Investment Study
- Alternative Corridors
- Cost Methodology and Estimate
- Travel Demand Forecasting
- Economic and Financial Feasibility
Assessment of Bridge Damage by Watercraft, Districts 2,3, and 7 South Louisiana
- Baseline Assessment of Bridges and Fender Systems
- Damage Assessment of Bridges
- Repair Plan and Cost Estimating
Complex Structures Load Rating
- Analysis and Rating of 37 complex Bridges, including multi-span steel curved plate girders and straight and curved box girders
Red River Bridge Design
- Preliminary/ Final Design of superstructure, piers and piles
- Ship Impact Analysis
- Rating Analysis
LA 15 Widening
- Upgrade of seven miles of two lane highway to four lane divided highway
- Rehabilitation of existing lift span bridge to fixed span bridge
- Design of new 500 ft pre-stressed concrete bridge
Clear Lake Bridge Design
* Preliminary and Final Design for the LA 1226 5 span continuous AASHTO Type IV pre-stressed concrete bridge over Clear Lake
Alternative Corridors
- Cost Methodology and Estimate
- Travel Demand Forecasting
- Economic and Financial Feasibility