Welcome to Atlas Nigeria International Engineering Services ltd.

atlas nigeria engineering

executed projects

Client: CHEVRON

Year:2008

  • Meren WIP Stage 1 = Sump Tank Relocation (DED)
  • Meren WIP Revamp Stage 2 (DED)


Year:2007

  • MOC 2313 Installation of Fire & Gas protection In QP 1 Okan Platform Control Room
  • MOC 2447 Installation of Wonderware for OKAN
  • MOC 2170 Installation Of Smoke Detection in the office on Malu PP.
  • Escravos Telecoms Building Power Feed
  • Abiteye Production Facility Surge Tank Replacement (Scope 2 to 7)
  • Escravos Instrument Master Drawing Index Verification
  • MWIP STG 2 = Meren WIP Revamp Phase 2 (FEED)
  • Escravos Terminal Diesel Storage (Pre-FEED)
  • Escravos Terminal Diesel Storage (FEED)
  • Replacement Abiteye-Escravos 26 inch Pipeline Project (FEED)
  • New Meji Complex Helideck Project (DED)


Year:2006

  • MOC 2049 Opolo Shipping Pumps Pressure Control
  • Warri Clinic UPS Upgrade
  • Meren WIP Revamp Phase 1
  • Delta PP Flare System
  • MOC 2040 Installation Of Civil Unrest Alarm at Abiteye F/S
  • MOC 2126 Installation of Fire and Gas Protection on BOP
  • MOC 2241 Install. Of Crash Alarm System Escravos Airport
  • Master Drawing Index Verification – Parabe
  • Master Drawing Index Verification – Opolo
  • Master Drawing Index Verification – Meji
  • Master Drawing Index Verification – Escravos Gas Plant
  • Abiteye Production Facility Surge Tank Replacement (scope 1)


Year:2005

  • BOP Upgrade – Hazan & Risk Assessment
  • Toside Modifications on Delta 4, Meren 77, Meren 102 and Mefa 1 Jackets
  • Escravos Electrical As-Built Backdrafting


Client:ADDAX PETROLEUM
Duration: 2007-2008

  • HAZOP on Adanga Redevelopment Phase 1
  • Topsides Piping Design for the Proposed ADI-1 Single Deck Tripod Water Injection Platform
  • Installation of 36 inch Conductor on Oron WHP
  • HAZOP for installation of Flare at Oron WP
  • Site Survey (one engineer x 5 days)
  • Oron WHP Installation of New Inlet Manifold
  • Oron Well Head Platform (OR-WHP) = Topside Piping Modification
  • Adanga South Platform Piping Modifications
  • HAZOP on Izombe Closed Drains System
  • Oron Well Head Platform = 16″ & 4″ Manifold extension
  • Akam and Ebughu PP Engine & Generator Change-out of two Exist. &  replace with two new on both Platforms
  • HAZOP Pipelines Project OML 123 Integrated Field Development
  • HAZOP for Adanga Redevelopment OML 123 Facilities Upgrade