executed projects
Client: CHEVRON
Year:2008
- Meren WIP Stage 1 = Sump Tank Relocation (DED)
- Meren WIP Revamp Stage 2 (DED)
Year:2007
- MOC 2313 Installation of Fire & Gas protection In QP 1 Okan Platform Control Room
- MOC 2447 Installation of Wonderware for OKAN
- MOC 2170 Installation Of Smoke Detection in the office on Malu PP.
- Escravos Telecoms Building Power Feed
- Abiteye Production Facility Surge Tank Replacement (Scope 2 to 7)
- Escravos Instrument Master Drawing Index Verification
- MWIP STG 2 = Meren WIP Revamp Phase 2 (FEED)
- Escravos Terminal Diesel Storage (Pre-FEED)
- Escravos Terminal Diesel Storage (FEED)
- Replacement Abiteye-Escravos 26 inch Pipeline Project (FEED)
- New Meji Complex Helideck Project (DED)
Year:2006
- MOC 2049 Opolo Shipping Pumps Pressure Control
- Warri Clinic UPS Upgrade
- Meren WIP Revamp Phase 1
- Delta PP Flare System
- MOC 2040 Installation Of Civil Unrest Alarm at Abiteye F/S
- MOC 2126 Installation of Fire and Gas Protection on BOP
- MOC 2241 Install. Of Crash Alarm System Escravos Airport
- Master Drawing Index Verification – Parabe
- Master Drawing Index Verification – Opolo
- Master Drawing Index Verification – Meji
- Master Drawing Index Verification – Escravos Gas Plant
- Abiteye Production Facility Surge Tank Replacement (scope 1)
Year:2005
- BOP Upgrade – Hazan & Risk Assessment
- Toside Modifications on Delta 4, Meren 77, Meren 102 and Mefa 1 Jackets
- Escravos Electrical As-Built Backdrafting
Client:ADDAX PETROLEUM
Duration: 2007-2008
- HAZOP on Adanga Redevelopment Phase 1
- Topsides Piping Design for the Proposed ADI-1 Single Deck Tripod Water Injection Platform
- Installation of 36 inch Conductor on Oron WHP
- HAZOP for installation of Flare at Oron WP
- Site Survey (one engineer x 5 days)
- Oron WHP Installation of New Inlet Manifold
- Oron Well Head Platform (OR-WHP) = Topside Piping Modification
- Adanga South Platform Piping Modifications
- HAZOP on Izombe Closed Drains System
- Oron Well Head Platform = 16″ & 4″ Manifold extension
- Akam and Ebughu PP Engine & Generator Change-out of two Exist. & replace with two new on both Platforms
- HAZOP Pipelines Project OML 123 Integrated Field Development
- HAZOP for Adanga Redevelopment OML 123 Facilities Upgrade